翻訳と辞書
Words near each other
・ New Milford North Purchase
・ New Milford Plant of the Hackensack Water Company
・ New Milford School District
・ New Milford Township, Susquehanna County, Pennsylvania
・ New Milford, Connecticut
・ New Milford, Illinois
・ New Milford, New Hampshire
・ New Milford, New Jersey
・ New Milford, Pennsylvania
・ New Mill
・ New Mill and Depot Building, Hawthorne Woolen Mill
・ New Mill End
・ New Mill Pond
・ New Mill, Cornwall
・ New Mexico Public Regulation Commission
New Mexico Rail Runner Express
・ New Mexico Rattler
・ New Mexico Renegades
・ New Mexico Republican primary, 2008
・ New Mexico Scenic and Historic Byway
・ New Mexico School for the Blind and Visually Impaired
・ New Mexico School for the Deaf
・ New Mexico Scorpions
・ New Mexico Senate
・ New Mexico shrew
・ New Mexico Slam
・ New Mexico Spaceport Authority
・ New Mexico spadefoot toad
・ New Mexico Stars
・ New Mexico State Aggies


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

New Mexico Rail Runner Express : ウィキペディア英語版
New Mexico Rail Runner Express

The New Mexico Rail Runner Express (NMRX) is a commuter rail system serving the metropolitan areas of Albuquerque and Santa Fe, New Mexico. It is administered by the New Mexico Department of Transportation (NMDOT) and the Rio Metro Regional Transit District (Rio Metro), a regional transportation agency, while Herzog currently holds the contract for the operation and maintenance of the line & equipment. Phase I of the system, operating on an existing right of way from Belen to Bernalillo that NMDOT purchased from BNSF Railway, opened in July 2006. Phase II, the extension of the line to Santa Fe, opened in December 2008.
==History==
The concept of passenger rail serving the Central New Mexico corridor had been discussed for decades, but it wasn’t until August 2003, when New Mexico Governor Bill Richardson announced that his administration was going to pursue the implementation of commuter rail service, that a serious effort got under way. Later that same year, grants were given to NMDOT and MRCOG to begin the effort, and the New Mexico State Legislature passed Governor Richardson’s Investment Partnership (GRIP), a transportation improvement package with the Rail Runner included as one of the bill's projects.
Over the next few years, NMDOT and MRCOG developed a strategy for implementing the rail service. In 2005, a name and a branding scheme was chosen. The name “Rail Runner” is a play on the name of New Mexico’s state bird, the roadrunner. The cars and locomotives were received throughout the year of 2005 and groundbreaking for the first Rail Runner station took place on October 31, 2005. During this time the state also conducted negotiations with BNSF over the use of the railroad track. After assessing the needs of the track, the state of New Mexico committed to purchasing the railroad corridor from Belen to the New Mexico-Colorado border from BNSF (although, thus far only the portion between Belen and Lamy, NM has been purchased), to ensure that commuter trains would always get the right-of-way and have priority over freight trains in the corridor. While the engines are capable of , the track limits the maximum speed to .
The Rail Runner officially went into service on July 14, 2006, serving the Downtown Albuquerque, Los Ranchos, and Sandoval County stations. On December 11, 2006, the Los Lunas station opened, and on February 2, 2007, the Belen station opened, extending the line to its southern end. In April 2007, two more stations opened: Bernalillo County/International Sunport on the 20th and Downtown Bernalillo on the 27th. On December 17, 2008, the Isleta Pueblo station opened.〔(Commuter Rail Status Report: "Belen to Santa Fe Commuter Rail Overview" )〕
Phase II, the extension of the line to Santa Fe, opened for service on December 17, 2008. Using the existing Santa Fe Southern Railway track from Lamy to Santa Fe, which is filled with sharp curves, would have required the train to slow to 15 miles per hour (24 km/h) in some places, so new tracks were laid to allow travel times comparable to the automobile. The route uses previously existing track from Bernalillo to the base of La Bajada, a hill south of Santa Fe. It then runs on newly built track on a new right-of-way from CP Madrid, for five miles and then in the I-25 median into Santa Fe, at CP Hondo, where it uses an improved Santa Fe Southern Railway track from I-25 to the terminal at the Santa Fe Railyard.〔("Rail Runner Route to Santa Fe" page on Rail Runner website )〕 Two of the planned stations for the Phase II extension opened on December 17: the South Capitol and the Santa Fe Depot stations. A third station at the NM 599/I-25 interchange in Santa Fe County opened on August 1, 2009.
After the opening of the Phase II stations, several more stations opened. Sandia Pueblo station, serving Sandia Pueblo, opened on August 29, 2011. The last planned station in within Bernalillo County, the Montaño station, officially opened on April 7, 2014. Kewa Pueblo station, serving Santo Domingo Pueblo, opened on March 22, 2010. It is the first station beyond the original 13 planned stations to reach the construction stage and was built using stimulus funds. On September 12, 2009, a special events platform opened for Lobo games service only.
At the end of March in 2014, the Rail Runner added security officers to the system. Officers are charged with protecting the trains, inspecting fares, and addressing issues at the stations and parking lots. The wearing and use of lapel cameras during incidents is also required.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「New Mexico Rail Runner Express」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.